Heavy Haulage Brisbane

Reliable 24/7 Heavy Haulage Towing Service

Safe, efficient, and professional heavy haulage towing Brisbane solutions when you need them most.

Heavy Haulage Brisbane — Oversize & Heavy Load Transport

Heavy haulage is not the same service as towing a broken-down truck. When we talk about heavy haulage, we mean the planned transport of vehicles and equipment that exceed standard mass or dimension limits. These jobs need permits, route planning, sometimes escort vehicles, and always a crew that understands the compliance requirements before the first wheel moves.

Delta Heavy Towing provides heavy haulage services across Brisbane, South East Queensland, and interstate. We handle the paperwork, plan the routes, arrange the escorts, and operate the transport. Our fleet includes heavy haul tow trucks, low loaders, drop decks, and extendable trailers, each configured for different load types.

What Counts as Heavy Haulage

In Queensland, a load becomes heavy haulage when it exceeds standard mass limits (typically 42.5 tonnes GCM for a standard semi-trailer) or standard dimension limits (2.5m wide, 4.3m high, 19m long). Once either threshold is crossed, NHVR permits are required and specific transport conditions apply.

Our heavy haulage work typically involves construction equipment being relocated between sites, industrial plant being delivered to factories or processing facilities, buses and coaches being transported between depots or to repairers, mining equipment heading to or from remote sites, and agricultural machinery moving between properties.

Warning Signs
Brisbane Towing

Our Heavy Haulage Fleet

We run purpose-built heavy haul equipment, not converted general trucks.

Our heavy haul tow trucks handle disabled heavy vehicles that need to be towed rather than transported. This includes semi-trailers with failed drive systems, buses with mechanical failures, and rigid trucks that cannot be driven. These trucks carry boom and underlift attachments rated for the loads they handle.

Our low loaders transport tracked and wheeled machinery that cannot travel on public roads under its own power. Excavators, bulldozers, rollers, and loaders go on low loaders because the low deck height keeps the overall transport height within manageable limits.

Drop deck trailers give us additional height clearance for tall loads. Extendable trailers accommodate long loads like bridge beams, structural steel, and pipeline sections.

Need immediate heavy haul towing in Brisbane? Call Delta Heavy Towing today!

Professional and experienced heavy haul towing Brisbane – anytime and anywhere. Over Dimensional Towing Brisbane: Safe & Compliant Oversize Load Experts 24/7

Prime Mover Hire & Trailer Towing

Routes and Corridors

We regularly run heavy haulage on these corridors:

How We Plan a Heavy Haul

Heavy Duty Towing

Why Choose Our Heavy Haulage Service

We have moved heavy loads through Brisbane’s road network enough times to know where the problems are before they happen. The bridge on that back street with a 15-tonne limit. The roundabout on the highway off-ramp that a low loader cannot get around without using both lanes. The power line on the access road to a construction site that clears a standard truck but not a tall load.

This kind of local knowledge saves time, prevents delays, and keeps the job compliant. Combined with our TruckSafe accreditation, NHVR compliance, and full insurance coverage, it means you can hand us a heavy haulage job and know it will be handled properly.

Frequently Asked Questions

Our fleet handles loads up to road train configurations. For very heavy individual pieces, we assess the load and select the appropriate trailer and prime mover combination.

For standard loads requiring Class 1 permits, a week’s notice is usually sufficient. For larger loads requiring higher class permits, allow 2-4 weeks for permit processing.

Some oversize loads are required to travel during off-peak hours. We arrange night transport where permit conditions require it.

Yes. For project moves involving multiple pieces of equipment, we plan the sequence, stage the transport, and coordinate deliveries so the site receives equipment in the right order.